<?xml version="1.0" encoding="UTF-8"?>
<rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>Die Guy &#187; validation</title>
	<atom:link href="http://www.dieguy.com/tag/validation/feed/" rel="self" type="application/rss+xml" />
	<link>http://www.dieguy.com</link>
	<description>Official Tim Stephens Website</description>
	<lastBuildDate>Fri, 03 Sep 2010 11:04:09 +0000</lastBuildDate>
	<generator>http://wordpress.org/?v=2.9.2</generator>
	<language>en</language>
	<sy:updatePeriod>hourly</sy:updatePeriod>
	<sy:updateFrequency>1</sy:updateFrequency>
			<item>
		<title>Feasibility vs. Validation</title>
		<link>http://www.dieguy.com/2010/03/11/feasibility-vs-validation-2/stephens/</link>
		<comments>http://www.dieguy.com/2010/03/11/feasibility-vs-validation-2/stephens/#comments</comments>
		<pubDate>Thu, 11 Mar 2010 14:30:39 +0000</pubDate>
		<dc:creator>stephens</dc:creator>
				<category><![CDATA[Engineering Decisions]]></category>
		<category><![CDATA[Tips & Techniques]]></category>
		<category><![CDATA[engineering process]]></category>
		<category><![CDATA[feasibility]]></category>
		<category><![CDATA[validation]]></category>

		<guid isPermaLink="false">http://www.dieguy.com/?p=542</guid>
		<description><![CDATA[I see alot of shops, with good intentions, performing engineering in the wrong sequence.
They process a job. They design the dies. Then, they run formability analysis. For the first time.
The first time formability simulation is run is called feasibility.
The question here is: will it work?
In other words, is the product design, material specification, and addendum [...]]]></description>
			<content:encoded><![CDATA[<p>I see alot of shops, with good intentions, performing engineering in the wrong sequence.</p>
<p>They process a job. They design the dies. Then, they run formability analysis. For the first time.</p>
<p>The first time formability simulation is run is called feasibility.</p>
<p>The question here is: will it work?</p>
<p>In other words, is the product design, material specification, and addendum feasible for production stamping?</p>
<p>Will it work?</p>
<p>Validation, on the other hand, is the act of making sure the die design intent is functional for production stamping.</p>
<p>The question validation must answer is: does it work?</p>
<p>There is a fundamentally practical difference between feasibility and validation. Feasibility is performed long before hundreds of hours of die design work is started.</p>
<p>Validation is a final check on the tools and process for the die design. Forces, travels, basic die mechanics (along with refined formability simulation analysis, of course).</p>
<p>Asking the feasibility question just days before the die shop will start making chips is the wrong time.</p>
<p>What if the development does not work?</p>
<p>What if the tool architecture does not work?</p>
<p>I will tell you what happens: redesign.</p>
<p>Formability must be done ahead of die design. It is that simple.</p>
<p>Go ahead and run simulation again at the end for validation if you like. But running it for the first time prior to die build, in most cases, will prove to be a time and money disaster.</p>
<p><a href="http://engineering.alltop.com/"><img src="http://badges.alltop.com/images/alltop_170x30_whoa.jpg" alt="Alltop. How the hell did that happen?" width="170" height="30" /></a></p>
]]></content:encoded>
			<wfw:commentRss>http://www.dieguy.com/2010/03/11/feasibility-vs-validation-2/stephens/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Feasibility vs. Validation</title>
		<link>http://www.dieguy.com/2009/07/30/feasibility-vs-validation/stephens/</link>
		<comments>http://www.dieguy.com/2009/07/30/feasibility-vs-validation/stephens/#comments</comments>
		<pubDate>Thu, 30 Jul 2009 16:12:41 +0000</pubDate>
		<dc:creator>stephens</dc:creator>
				<category><![CDATA[Engineering Decisions]]></category>
		<category><![CDATA[Tips & Techniques]]></category>
		<category><![CDATA[eric kam]]></category>
		<category><![CDATA[feasibility]]></category>
		<category><![CDATA[simulation]]></category>
		<category><![CDATA[validation]]></category>

		<guid isPermaLink="false">http://www.dieguy.com/?p=270</guid>
		<description><![CDATA[My dear friend Eric Kam does a great job conveying stamping simulation &#8220;geek speak&#8221; with his blog.
There has been much talk recently in the industry and online about forming simulation feasibility versus validation.
Reams of paper documents and terabytes of data have been generated by the PhD crowd about this topic.
From the trenches, let me boil [...]]]></description>
			<content:encoded><![CDATA[<p>My dear friend <a class="wpgallery" href="http://erickam.wordpress.com/" target="_blank">Eric Kam</a> does a great job conveying stamping simulation &#8220;geek speak&#8221; with his <a class="wpgallery" href="http://erickam.wordpress.com/" target="_blank">blog</a>.</p>
<p>There has been much talk recently in the industry and online about forming simulation feasibility versus validation.</p>
<p>Reams of paper documents and terabytes of data have been generated by the PhD crowd about this topic.</p>
<p>From the trenches, let me boil it down to its core.</p>
<p>Simply stated, think of feasibility as &#8220;make it work&#8221;.</p>
<p>Validation can then be defined as &#8220;does it work&#8221;.</p>
<p>Plain and simple &#8230;</p>
<p><a href="http://engineering.alltop.com/"><img src="http://badges.alltop.com/images/alltop_170x30_whoa.jpg" alt="Alltop. How the hell did that happen?" width="170" height="30" /></a></p>
]]></content:encoded>
			<wfw:commentRss>http://www.dieguy.com/2009/07/30/feasibility-vs-validation/stephens/feed/</wfw:commentRss>
		<slash:comments>2</slash:comments>
		</item>
	</channel>
</rss>
